SPRINKLER TANK REPAIR & FIBREGLASS LINING - SHEFFIELD

The internal wall surfaces of this 30 year old galvanised sprinkler tank were corroding badly causing it to leak persistently.

This 30 year old galvanised sprinkler tank was leaking badly. The tank was rusting from the inside out. The original factory coating system had broken down completely and the rust had taken over.

The only repair system that was going to restore this tanks integrity and make it watertight was the application of our guaranteed for 25 year fibreglass lining system.

Originally, the only way into the tank was through the BVH on the roof. To create a safe working environment and improve access & egress we installed an access manway into the wall of the tank at ground level.

Initially the only way into the tank was by accessing the roof and through the BVH (Ball Valve Housing) and then another ladder down into the tank and floor. This really wasn't a safe way of working, so we cut an opening into a lower wall panel and installed a safety access hatchway.

Before any application the surfaces had to be abrasive gritblast cleaned. This process exposes the weaknesses in the substrate, highlighting the areas for repair.

Fist things first...the surfaces had to be cleaned and keyed by abrasive grit blasting. This process exposed all the weaknesses in the steel wall of the tank and highlighted the areas for repair...lots of them.

All the holes, badly corroded ares and panel seams were repaired using layers of reconstructive fibreglass. Once all the repairs had cured, a double skin fibreglass lining was applied to the complete wall surface area

After grit blasting, the surfaces were primed with polyester resin and all the holes, corroded areas and panel seams repaired and reconstructed using layers of fibreglass matting. Once all the repairs had cured, a double skin fibreglass lining was applied to the complete wall surface area, sealing onto the concrete floor all the way round the inside corner of the tank.

When the completed fibreglass lining had cured a coloured topcoat was applied to seal the whole system.

When the completed fibreglass lining had cured, a coloured polyester gel topcoat was applied to seal the whole system guaranteeing our works for 25 years.

A week after starting our works... we bolted up the access manway and the client put the tank back into service